DE
EN
DE
EN
Search
Contact us
Glossary
Web API
DE
EN
Extranet
TAM reporting portal
DE
EN
About us
About us
Tasks
Task of SG HoBA
Planning and operation of the German transmission grid
Latest news
Press
Grid fees
Construction cost subsidy
Studies and position papers
Information platforms
Disclosure obligations in accordance with the EU Transparency Regulation
TAM reporting portal
Renewable energies and levies
Renewable energies and levies
EEG
EEG financing
EEG billing
Transparency requirements
Archive
KWKG
KWKG levy
KWKG billing
Transparency requirements
Other levies
Offshore grid levy
Surcharge for special grid usage / § 19 StromNEV levy
§ 18 Disposable loads (AbLaV) levy
Voluntary publications
Wind and solar energy projection
Wind and solar energy forecast (until 15.12.2022)
Balancing Capacity
Balancing Capacity
Imbalance price
Uniform imbalance price (reBAP)
Imbalance price modules (IP)
Financial impact of IP modules
IP estimator
IP Index
Value of Avoided Activation (VoAA)
GCC and LFC Area balance
GCC balance traffic light
GCC balance
LFC Area balance
Balancing Capacity data
Activated Balancing Capacity
Optimized balancing capacity
Difference (unintended exchange)
Special balancing measures
Data in second resolution
MOL deviations
Old data archive
Disposable loads (AbLaV)
aFRR AT/DE cooperation
mFRR AT/DE cooperation "GAMMA"
IGCC data points
Ancillary Services
Ancillary Services
Frequency stability
Voltage stability
Market-based procurement of reactive power in accordance with Section 12h EnWG
Standardized design of E-STATCOM
System operations
Redispatch
Capacity reserve
Elektrolysers
Voluntary load reduction
Use instead of curtail
Schedule Management
Emergency restoration
Market-based procurement of black start capability
Electricity market design
Electricity market design
Electricity Market Forum
CACM Regulation
Generation and load data provision methodology - GLDPM
Clean Energy Package
Participation of German capacities in the Belgian capacity mechanism
Participation of German capacities in the Polish capacity mechanism
Electricity Balancing (EB)
Balancing group contract
ER Regulation
FCA Regulation
SO Guideline
CGMMv3
Data exchange
RfG Regulation
4TSO study on the development of a capacity mechanism for the German electricity market
Electricity price brake
Home
About us
Studies and position papers
Studies and position papers
Automatically translated with
deepl.com
.
Studies / Reports / Analyses
Demand analysis 2023 (t+1)
Special analyses winter 2022/2023
Study on grid reconstruction concepts against the backdrop of the energy transition (27.01.2021)
Study on grid protection (21.01.2021)
Study of the accelerated coal phase-out by 2030
Study "Frequency stability Necessary time response for over- and underfrequency (27.06.2018)
Study on conventional minimum production
Study on the accelerated coal phase-out by 2030
Position papers / statements
Interaction studies and model requirements (16.05.2023)
Switch to SF6-free
technologies
White Paper on grid and supply reconstruction 2030 (08.12.2022)
Basic requirements for grid-forming inverters (10.05.2022)
Position paper "Demand for the development of grid-forming STATCOM systems" (08.12.2020)
Statement of the transmission system operators on the consultation of the Commission's final report on the future procurement of reactive power (20.12.2019)
FRT requirements
Requirements for the connection of electrolyser facilities
Requirements for the connection of battery storage facilities