EEG system master data for the 2023 annual statement
The system master data reported to the transmission system operators for the 2023 annual statement is available for download as a file.
The file contains the master data of all EEG installations that were reported by the DSOs to the TSOs as part of the 2023 EEG annual report. This may result in decommissioning during the year as well as grid transitions between two grid operators, resulting in double entries of the plant codes. In general, the master data reflects the status as at 31.12.2023 or the day of decommissioning or grid disconnection.
The files also contain the systems directly or indirectly connected to the transmission system operators' grids. For data protection reasons, the street and house number are not specified for systems with an installed capacity of less than 30 kW.