DE
EN
DE
EN
Search
Contact us
Glossary
Web API
DE
EN
Extranet
TAM reporting portal
DE
EN
About us
About us
Tasks
Task of SG HoBA
Planning and operation of the German transmission grid
Latest news
Press
Grid fees
Construction cost subsidy
Studies and position papers
Information platforms
Disclosure obligations in accordance with the EU Transparency Regulation
TAM reporting portal
Renewable energies and levies
Renewable energies and levies
EEG
EEG financing
EEG billing
Transparency requirements
Archive
KWKG
KWKG levy
KWKG billing
Transparency requirements
Other levies
Offshore grid levy
Surcharge for special grid usage / § 19 StromNEV levy
§ 18 Disposable loads (AbLaV) levy
Voluntary publications
Wind and solar energy projection
Wind and solar energy forecast (until 15.12.2022)
Balancing Capacity
Balancing Capacity
Imbalance price
Uniform imbalance price (reBAP)
Imbalance price modules (IP)
Financial impact of IP modules
IP estimator
IP Index
Value of Avoided Activation (VoAA)
GCC and LFC Area balance
GCC balance traffic light
GCC balance
LFC Area balance
Balancing Capacity data
Activated Balancing Capacity
Optimized balancing capacity
Difference (unintended exchange)
Special balancing measures
Data in second resolution
MOL deviations
Old data archive
Disposable loads (AbLaV)
aFRR AT/DE cooperation
mFRR AT/DE cooperation "GAMMA"
IGCC data points
Ancillary Services
Ancillary Services
Frequency stability
Voltage stability
Market-based procurement of reactive power in accordance with Section 12h EnWG
Standardized design of E-STATCOM
System operations
Redispatch
Capacity reserve
Elektrolysers
Voluntary load reduction
Use instead of curtail
Schedule Management
Emergency restoration
Market-based procurement of black start capability
Electricity market design
Electricity market design
Electricity Market Forum
CACM Regulation
Generation and load data provision methodology - GLDPM
Clean Energy Package
Participation of German capacities in the Belgian capacity mechanism
Participation of German capacities in the Polish capacity mechanism
Electricity Balancing (EB)
Balancing group contract
ER Regulation
FCA Regulation
SO Guideline
CGMMv3
Data exchange
RfG Regulation
4TSO study on the development of a capacity mechanism for the German electricity market
Electricity price brake
Home
Electricity market design
CACM Regulation
Generation and load data provision methodology - GLDPM
Decisions
Decisions
Automatically translated with
deepl.com
.
Downloads
08.12.2017
Approval of the proposal of all TSOs for a single methodology for the provision of generation and
load
data in accordance with Article 17 of Commission Regulation (EU) 2016/1719 of 26 September 2016 establishing a guideline for the allocation of long-term capacity. [in German]
Beschluss der
Bundesnetzagentur
BK6-17-034, PDF, 165.4 KB,
28.06.2024
11.01.2017
Approval by All Regulatory Autorities agreed at the Energy Regulators' Forum of the All
TSO
Proposal for Generation and
Load
Data Provision Methodology
approval_of_GLDPM_by_NRAs_dated_2016_10_28, PDF, 282.71 KB,
28.06.2024
11.01.2017
CACM English version
CACM_en, PDF, 667.77 KB,
28.06.2024
11.01.2017
CACM German version
CACM_de, PDF, 707.86 KB,
28.06.2024
11.01.2017
GLDPM English version
GLDPM-2016-05-16-EN, PDF, 547.48 KB,
28.06.2024
11.01.2017
GLDPM German version
GLDPM-2016-05-16-DE, PDF, 368.37 KB,
28.06.2024