Data exchange
The "Data sheet for grid connection of generation plants and storage facilities" was developed by the German transmission system operators 50Hertz Transmission GmbH, Amprion GmbH, TenneT TSO GmbH and TransnetBW GmbH. It is used to collect the data required to assess a grid connection request and to carry out simulation calculations and fulfills the requirements of Article 41 (3) of the RfG (EU 2016/631) with regard to transparency in data exchange. The grid connection data sheet for generation plants and storage systems must be submitted in addition to the completed Annex E of VDE-AR-N 4130.